Product Detail
Product Tags
Related Video
Feedback (2)
We not only will try our great to supply outstanding services to every shopper, but also are ready to receive any suggestion offered by our buyers for Residual Current Circuit , Breaker Panel , Dc Circuit Breakers For Solar Panels , Teamwork is encouraged at all levels with regular campaigns. Our research group experiments on various developments during the industry for improvement within the solutions.
CE Certification Rcbo Circuit Breaker Exporter Residual Current Circuit Breaker with Overcurrent Protection CJRO2-40 – C&J Detail:
Construction and Feature
- Provides protection against earth fault/leakage current, short-circuit, overload, and function of isolation.
- Contact position indication
- Provides protection against indirect contact by human body
- Provides complementary protection against direct contact by human body.
- Effectively protects electric equipment against insulating failure
- Equipped with switched neutral and phase pole
- Provides protection against over-voltage
- Provides comprehensive protection to household and commercial distribution systems.
- S2 Shunt Tripper
- U2+O2 Over-voltage and under-voltage tripper
Technical Data
| Standard |
IEC61009-1/EN61009-1 |
| Type |
Electronic type |
| Residual current characteristics |
AC |
| Pole No |
1P+N |
| Tripping curve |
B, C, D |
| Rated short-circuit capacity |
6kA |
| Rated current (A) |
6A, 10A, 16A, 20A, 25A, 32A |
| Rated voltage |
230V AC |
| Rated frequency |
50/60Hz |
| Rated residual operating current(mA) |
0.03, 0.1, 0.3 |
| Tripping duration |
instantaneous≤0.1s |
| Electro-mechanical endurance |
4000 cycles |
| Connection terminal |
pillar terminal with clamp |
| Terminal Connection Height |
H1=16mm H2=21mm |
| Over-voltage tripping |
280V±5% |
| Connection capacity |
Flexible conductor 10mm² |
| Rigid conductor 16mm² |
| Installation |
On symmetrical DIN rail 35.5mm |
| Panel mounting |
Overload Current Protection Characteristics
| Test procedure |
Type |
Test Current |
Initial State |
Tripping or Non-tripping Time Limit |
Expected Result |
Remark |
| a |
B,C,D |
1.13In |
cold |
t≥1h |
no tripping |
|
| b |
B,C,D |
1.45In |
after test a |
t<1h |
tripping |
Current in the 5s in th increase of stability |
| c |
B,C,D |
2.55In |
cold |
1s<t<60s |
tripping |
|
| d |
B |
3In |
cold |
t≤0.1s |
no tripping |
Turn on the auxiliary switch to close the current |
| C |
5In |
| D |
10In |
| e |
B |
5In |
cold |
t<0.1s |
tripping |
Turn on the auxiliary switch to close the current |
| C |
10In |
| D |
20In |
| The terminology “cold state” refes to that no load is carried before testing at the reference setting temperature. |
Residual Current Action Breaking Time
| Residual Current Action Breaking Time |
| type |
In/A |
I△n/A |
Residual Current (I△) Is Corresponding To The Following Breaking Time (S) |
| I△n |
2 I△n |
5 I△n |
5A,10A,20A,50A,100A,200A,500A |
I△t |
|
general
type |
any
value |
any
value |
0.3 |
0.15 |
0.04 |
0.04 |
0.04 |
Max Break-time |
A Type Of Trip Current Range
| Lagangle(A) |
A Tripping Current(A) |
| Lower Limit |
Upper Limit |
| 0° |
0.35 I△n |
0.14 I△n |
| 90° |
0.25 I△n |
| 135° |
0.11 I△n |
Product detail pictures:
Related Product Guide:
Quality initially, Honesty as base, Sincere company and mutual profit is our idea, in order to create repeatedly and pursue the excellence for CE Certification Rcbo Circuit Breaker Exporter Residual Current Circuit Breaker with Overcurrent Protection CJRO2-40 – C&J , The product will supply to all over the world, such as: Poland, Mexico, Cape Town, Our products are very popular in the word, like South American, Africa, Asia and so on. Companies to create first-class products as the goal, and strive to deliver customers with high quality solutions, present high-quality after-sales service and technical support, and customer mutual benefit, create a better career and future!
The product manager is a very hot and professional person, we have a pleasant conversation, and finally we reached a consensus agreement.
By Atalanta from Saudi Arabia - 2017.03.08 14:45
It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
By Albert from New Delhi - 2017.09.26 12:12